data center construction cost

  • data center cost per MW

    ​Estimating the data center cost per MW in 2026 requires understanding a paradigm shift. Moving away from standard builds, modern facilities are defined by the explosive power and cooling demands of AI workloads. This guide breaks down current CapEx trends, analyzing how Tier requirements, high-density server racks, and advanced liquid cooling architectures are driving costs between $10 million and $22 million+ per megawatt, providing the transparency required to mitigate risk and protect project ROI.